As energy-intensive industries and independent power producers face soaring equipment lead times and high capital costs, a pristine, pre-owned Siemens SGT-300 gas turbine generator set has entered the global market, offering an immediate, cost-effective solution for reliable decentralized power and combined heat and power (CHP) applications.

  • SGT-300-1.jpg
  • 27e864e0057a4749b8cef54d2fbadb20.jpg
  • 0fe2cc8e66b6d8592b983975a82e3d3e.jpg

This complete, skid-mounted SGT-300 package is in exceptional, near-new condition. Comprehensive inspection and testing records confirm that the unit underwent full internal function testing, complete instrument calibration, and final quality sign-off in 2022, receiving official dispatch certification. The core turbine and auxiliary systems have been meticulously preserved with anti-corrosion protection, sealed covers, and desiccants, ensuring factory-grade integrity and operational readiness.

  • SGT-300-2.jpg
  • 221ba256812aafea3263a2950c880c96.jpg
  • b13730875b05dbe18a89a5ef108eb844.jpg
  • db94e62fe12513613d8f69a8e8c32b6f.jpg

The package is fully integrated within a heavy-duty, weatherproof acoustic enclosure designed for outdoor installation. Mechanical power transmission is driven by an Allen Gears compound star gearbox (manufactured in 2021, rated at 10,000 kW), converting the turbine’s 14,045 RPM input to a steady 1,500 RPM output for 50 Hz electrical power generation. The unit comes complete with an integrated generator, advanced turbine control system, multi-stage air intake filtration, Emerson and Hydac instrumentation, and an internal overhead service crane for streamlined maintenance.

  • SGT-300-4.jpg
  • SGT-300-5(ca9d668089).jpg

Renowned for fuel versatility, low emissions, and proven thermal efficiency, the SGT-300 is the industry benchmark for industrial manufacturing, district heating, and oil & gas facilities. By bypassing standard 18-to-24-month OEM manufacturing delays, this ready-to-dispatch package provides project developers with substantial CAPEX savings and immediate commercial operation capabilities.

  • SGT-300-3.jpg
  • SGT-300-6.jpg
  • SGT-300-7.jpg

Full technical documentation, inspection certificates, and on-site inspection arrangements are available upon inquiry.