×

Get in touch

News


Home >  News

Second Condenser Tube Bundle Modules For 300MW Power Plant In Philipines Succesfully Dispatched

Time: 2020-11-20

After successfully supplying two 300MW condenser bundles last year, Dongturbo successfully obtained order of supply two sets of 300MW condenser bundle modules this year, and completed production in October 2020, and has now arrived at the owner's site.

  • 2.4.0
  • 2.4.1
  • 2.4.5
  • 2.4.5
  • 2.4.3

PREV : The First Chinese Primary Reheat Waste Power Turbine Designed And Manufactured By Shanghai Electric Was Delivered

NEXT : One Set Of 150KW Micro Steam Turbine Dispatched To Turkey