Biomassa et MSW Potentia Planta-Biomassa et MSW Potentia Planta-Dongturbo Electrica Societas Ltd. (DTEC).

×

Adloquere Nos

Statio Energetica Biomasse et Residuorum Urbicarum


Pagina Prima >   >  Statio Energetica Biomasse et Residuorum Urbicarum

Dongturbo offert EPC servitium de biomassa et MSW potentia plantae, postea principaliter concentratum in MSW potentia plantam. In MSW-Ad-Energiam potentia planta, Dongturbo dedicatur ad praebendum clientibus "omnium in unum" solutionem, implicans dejectiones remotionem, environmentalis pollutionis, socialis pressurae, finantiae, etc.

Our company, while cultivating the use of traditional fossil fuel energy (including coal, oil, natural gas, etc.), is also devoted to the use of renewable energy (including biomass waste, household waste, industrial waste, hazardous waste, sludge, biogas, etc.) and ultra-clean gas emissions (including dust removal, desulfurization, denitration, mercury removal, whitening, VOCs, etc.) and other environmental protection fields, with fruitful achievements.

Nostra societas platformam digitalem habet pro toto processu technico: designo digitali, delivero digitali, et operatione ac manutenentia digitali. Nostra societas programmatum Bentleianum ad designum tridimensionale digitale utitur, quod varias functiones designandi realizzare potest, inter quas modellatio parametrica tridimensionalis, modellatio superficiei et solidorum, modellatio tubulationum, planificatio facultatum, mappatio GIS, modellatio HVAC tridimensionalis, etc.

We provide comprehensive services of technical consultation, technology development, professional design, complete equipment manufacturing and EPC contracting and so on. We always stick to the principle of quality first and reputation supreme and the service concept of "from customer's need, to customer's satisfaction" to convey the professional service and create high‐quality projects. d maintenance.

ASME
DNV
Testimonia Factory

Biomass Combustion


image236
image237

Wilmar Pan Jin Biomassa Gasificatio EPC
PROJECTUMMILESTONIUM
2X20 t/h+1 X 12. 500. 000 Kcal, Liaoning-China

图片5

Xuzhou Diyuan 1X130t/h+1X30MW Biomassae Statio Energetica, Jiangsu - Sinae

图片6
图片7

Jinneng Biomass Power Generation Co. ,Ltd.
1X150t/h+1X30MW
Shandong - Sinae

image258

PTG 1X100t/h+1X24MW Biomassae Statio Energetica
Changwat Pattani-Thailandia

Ancipitia vastum Incineratio


image162
image165
图片1

Utilitas Comprehensiva Rerum
2×600t/d+1×22MW+1×25MW Project
inNantong, Chin

image179
image180
图片3

30.000 t/a Expansio EPC pro Incineratione Residuorum
(utensilitia caloris residui apparatus) Beikong Annaide Environment
Technology Development Changzhou Co., Ltd. Changzhou-China

Familia vastum Incineratio amet


image188
image189
image190
image191

Tianyin Environmental Protection Energy Co., Ltd. Utilizatio Innocua et Protectio Ambientalis Residuorum Urbani in Guyuan, Ningxia, China: 3×350 t/d + 1×12 MW + 1×6 MW

image192 拷贝
image194
图片4

Projectum de Utilizatione Completa Rerum Naturalium: 2×600 t/d + 1×22 MW + 1×25 MW in Nantong, China

EPC/Investitio & Operatio

Solutio Conversionis Excrementi in Energiam

Systema Acceptationis et Conservandi Excrementum

Systema Praepraeparationis MSW

Systema Combustionis MSW

Caldaria cum Grate Mechanica

Incinerator CFB de RSU

Systema recuperationis caloris

Systema purificationis fumi tubi

Systema manipulationis cineris fundi

Systema manipulationis cineris volantis

Systema Treatment Leachati

Systema Treatment Leachati

Systema control oloris

Dispositio generalis fabricae

Melioratio servitii

Non. Projects Unitas Index
1 Capacitas treatment cotidiana ton/d 1500
2 Capacitas annua treatmentis tonnas/annum 500.000
3 Parvus calor valor kJ/kg 4200~9000
4 Horae operationis (per annum) h > 8000
5 Generatio per reticulum 108`kWh\/annum 1.7–2.0
6 Consumptio virium plantationis % 18~20
7 Exitus turbine vaporis MW 25
8 Efficientia thermica (universa)
processus)
% 22~23
9 Vita Servitii annus 25~30
10 Consumptio aquae tonnas/annum 1.240.000
11 Plant area metra Quadrata 90.000–100.000
12 AEMULUS pERSONAE 90~100
13 Tempus aedificandi mensis 30~36