×

Get in touch

Used Gas turbines


Home >  Products >  Gas Turbine >  Used Gas turbines

Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available
Siemens Usd Gas Turbine SGT-400 is Available

Siemens Usd Gas Turbine SGT-400 is Available

Product Brochure:DOWNLOAD

  • Introduction
Introduction

We, Dongturbo, hereby would like make our best offer as follows for your target products.

1.Scope of supply

1.1 The list below is Siemens SGT400 GTG set supply scope, which will be provided by seller

Siemens SGT400 GTG sets are currently installed

Item

Supply Scope

Qty.

1

  • Main unit: Engine, gearbox, generator, including base and housing;
  • Pry into the fuel system: shut-off valves, control valves, metering, etc;
  • Lubrication and cooling system: oil pump, oil cooler, etc;
  • AC/DC systems: chargers, AC/DC MCC, etc;
  • Gas turbine intake system: air intake filter, intake silencer, etc;
  • Hood ventilation system: ventilation filters, ventilation fans, silencers, etc;
  • Unit CO2 fire extinguishing system: CO2 cylinders, detectors, alarms, control system, piping, etc;
  • Unit start device: starter motor;
  • Unit control system: unit control cabinet, control system hardware and software, etc.

2 Set

1.2 Siemens SGT400 GTG set basic information:

Engine

Siemens SGT400

Fuel Nozzle

NG

Power:

14.4MW

Combustion Type

DLE

Manufacture time

2018

Commissioning time

2023

Rated Speed

9525/1500 RPM

Voltage

10.5Kv

Current status

The two units were manufactured in 2018, put into operation after debugging in 2023, and ran for 243 and 237 hours respectively.

Generator:

ALLAN

Frequency:

50HZ

1.3 Onsite pictures:

  • 图片 1.jpg
  • 图片 2.jpg
  • 图片 3.jpg
  • 图片 4.jpg
  • 图片 5.jpg
  • 图片 6.jpg

2.Price

Siemens SGT400 GTG set price is as below 

Item

Description

Item scope

Unit Price

(USD)

Qty

(e.a)

Total-USD

1

Siemens SGT400 GTG set

2

12,000,000.00

   2

24,000,000.00

TOTAL FOB SHANGHAI AMOUNT IN USD

24,000,000.00

The above price includes the cost of the scope of supply mentioned in item 1, disassemble cost, packaging and transportation cost to Shanghai port.

3.Delivery time

    The products will be dispatched within 3 MONTHS after the contract signed and downpayment received.

4.Payment terms

  • 50% of contract amount shall be paid with 10 days after contract signed and issuing invoice.
  • 50% of contract amount shall be paid after the receipt of the products readiness from Seller.

5.Quality assurance

Not available, the gas turbine generator sets are sold as "as is" 

6.Price validity

This offer will be validated for 10 days.

RELATED PRODUCT