×

Get in touch

Used Gas turbines


Home >  Products >  Gas Turbine >  Used Gas turbines

Used Solar Gas Turbine Taurus 70
Used Solar Gas Turbine Taurus 70
Used Solar Gas Turbine Taurus 70
Used Solar Gas Turbine Taurus 70
Used Solar Gas Turbine Taurus 70
Used Solar Gas Turbine Taurus 70
Used Solar Gas Turbine Taurus 70
Used Solar Gas Turbine Taurus 70

Used Solar Gas Turbine Taurus 70

Product Brochure:DOWNLOAD

  • Introduction
Introduction

Sub: Solar T70 package

We, Dongturbo, hereby would like make our best offer as follows for your target products.

1. Scope of supply

The list below is Solar T70 package scope, which will be provided by seller.

Solar T70 NG Conventional Burner Gas Turbine

Item Supply Scope Qty.
1 Solar T70 gas turbine generator set;
1). Main Body: Includes the gas turbine, generator, gearbox, engine base, and silent enclosure.
2). Lubricating Oil System: Includes the main oil pump, AC oil pump, DC oil pump, dual-row oil filter, oil cooler (air-cooled), oil mist separator, and oil piping.
3). Fuel Gas System: Includes the shutoff valve, vent valve, regulating valve, and piping within the hood.
4). Gas Turbine Air Intake System: Utilizes a Donaldson self-cleaning air filtration system, including the filter unit, backflush device, control system, elbow connecting to the hood, air intake silencer, support frame, maintenance platform, and ladder.
5). Hood Ventilation System: Includes the ventilation filter, air duct, fan, and silencer.
6). Unit Fire Protection System: Includes the CO2 cabinet, controller, flame detector, temperature detector, gas detector, and alarm.
7). Electrical System: Includes the MCC, starter motor inverter, and charging cabinet.
8). Others: exhaust system, compressed air system (inside skid), cleaning system (inside skid).
The price includes gas turbine package, generator package, and auxiliary items outside refurbish, include deformation correction, de-rusting, re-painting.
1 Set

Solar T70 gas turbine basic information

Engine T70 Gas Turbine
Fuel Nozzle NG
Year of Manufacture 2004
Commissioning time 2005
Total Firing Hour 10000 hours
Last firing date 2012

2. Price

Solar T70 NG Conventional Burner gas turbine package price is as below

Item Description Item scope Unit Price (USD) Qty (e. a) Total
Solar T70 Gas Turbine 1 2, 950, 000. 00 1 2, 950, 000. 00

TOTAL FOB SHANGHAI AMOUNT IN USD FOR ONE SET 2, 950, 000. 00

3. Delivery time

The products will be dispatched within 75 days after the contract signed and advance payment received.

4. Payment terms

50% of contract amount shall be paid with 10 days after contract signed and issuing invoice.
50% of contract amount shall be paid after the receipt of the products readiness from Seller.

5. Quality assurance

Not available

6. Price validity

This offer will be validated for 10 days.

Annex 1: Solar T70 Gas Turbine pictures

RELATED PRODUCT